Noetic

Updates

Build log.

Dated entries, newest first. Below them, the milestones we named in the white paper. Each one flips to done here when it is, not before.

Log

  1. Site

    About and Updates pages added.

    The site now runs a small state model on the home page, and gains an About page and this log.

  2. Site

    Launch site published.

    First public page for Noetic: the design target, the architecture, and the benchmark areas.

  3. Paper

    White paper: the thesis behind Noetic.

    Five pages on why state models and specialized silicon belong together, the business model, the technical plan, and what could go wrong. Read the PDF.

Milestones

What done looks like in 6 to 12 months.

Taken from the September 2026 white paper. Status is updated in place.

  1. M1

    v1 performance model running, first workloads and targets defined, interfaces locked.

    Open
  2. M2

    Coral baseline verified, RTL review flow in place, first feasibility and timing numbers fed back to architecture.

    Open
  3. M3

    First synthesis and place-and-route results, and a baseline PPA report.

    Open
  4. M4

    A benchmark suite for the target workflows, with Jetson and unified-memory comparisons.

    Open
  5. M5

    First customer workflow quantized and distilled through our process and mapped onto the design.

    Open
  6. M6

    Bangalore assembly and test setup running.

    Open